William's Electrical logoWilliam’s
Electrical

Guides · Kent

Fuse Board Replacement in Canterbury: What People Ask

Thinking about a new consumer unit in Canterbury? Real answers on RCBOs, metal boards, remedial work, certificates and what drives the cost.

NAPIT registered 10-year workmanship warranty BS 7671 · 18th Edition Part P self-certified

William’s Electrical · 20 November 2026 · 6 min read

The old grey box under the stairs

Lift the lid on the board in a lot of Canterbury homes and you will still find ceramic or plastic fuse carriers with a strand of fuse wire inside. The Victorian terraces off Wincheap and the 1930s semis along the New Dover Road are full of them, along with early plastic boards where one trip switch covers half the house. They coped with the loads of their day. Showers, induction hobs, car chargers and a kitchen full of appliances ask a great deal more.

If you have been quoted for a consumer unit replacement, or someone has told you your board "isn't to current standards", here are the questions homeowners around Canterbury and the rest of Kent tend to ask before they book the work in.

Your questions about replacing a fuse board

How do I know my fuse board actually needs replacing?

A few things point that way. Rewireable fuses with fuse wire rather than breakers. A board with no RCD protection at all, which means no fast disconnection if someone puts a nail through a cable or a faulty appliance sends current where it should not go. A wooden back board, or a plastic enclosure sitting somewhere current standards would expect something non combustible. Scorching around a fuse way, discoloured terminals, or a smell of hot plastic near the board.

Nuisance tripping is another clue, though the board is not always the culprit. Sometimes the board is sound and there is a circuit fault hiding behind it. That is why someone needs to look at the installation properly before quoting on hardware alone.

What is the difference between an RCD board and an RCBO board?

On a split load board, one RCD protects a group of circuits. If something goes wrong on any one of them the whole group drops out, so a failing freezer in the utility can take your upstairs lights with it. On an RCBO board each circuit gets its own combined breaker and residual current device, so a fault usually only knocks out the circuit that caused it.

RCBOs cost more in parts and involve more connections inside the enclosure, which adds to the labour. Anyone who has gone hunting for a torch in a dark hallway tends to think they are worth it.

Does the new consumer unit have to be metal?

In domestic premises the wiring regulations generally expect the enclosure to be non combustible, and a steel enclosure is the usual way of achieving that. There are exceptions depending on where the board sits and how it is mounted, so it is a question for the electrician standing in front of your installation rather than a blanket rule.

Surge protection sits alongside it. The current edition of BS 7671 has pushed surge protective devices towards being the norm in many dwellings, subject to an assessment of risk for the property. Rules move on, so what was acceptable when your board went in may not be what applies in 2026. Your electrician can tell you whether surge protection applies to your house and what it means for space inside the board.

Will other work be needed before the new board can go in?

Often, yes, and a straight quote will warn you about that up front. A board full of RCBOs is far more sensitive than an old fuse board, so faults that were quietly tolerated for years can start tripping circuits the moment it is energised. Around older Kent housing stock the usual suspects are damp or perished cable running out to a garage or shed, a borrowed neutral between a landing and hall light, and old rubber or lead sheathed wiring that has gone brittle.

Main protective bonding gets checked too. Incoming gas and water services normally need bonding conductors of an adequate size back to the earthing terminal, and on older properties those are often undersized or missing altogether. The earthing arrangement, the meter tails and the position of the main switch all form part of the job.

Does the electricity have to be switched off?

Yes. The circuits are dead while the board is changed over. In some cases the main service fuse ahead of the meter needs to be withdrawn so the tails can be worked on safely. That cut out belongs to the distribution network operator, which for this part of Kent is UK Power Networks, or to your supplier. Where it is needed it has to be arranged properly rather than improvised, so ask how your electrician plans to handle isolation.

Is it notifiable work?

Replacing a consumer unit is notifiable under Part P of the Building Regulations in England. A registered electrician can self certify the work rather than you paying building control separately. Williams Electrical Kent is NAPIT registered with Part P self certification, so the work can be notified through the scheme and carried out to BS 7671.

What paperwork should I end up with?

An Electrical Installation Certificate for the new board, with schedules of inspection and the test results for each circuit, is the key document. You should also receive a Building Regulations compliance notification. Keep both somewhere safe. They matter when you sell, when a letting agent asks, and when an insurer wants evidence that a competent person did the work.

The board itself should be clearly labelled so anyone can see which breaker serves what, rather than a faded strip of masking tape saying "upstairs".

What drives the price up or down?

The type of board, the number of circuits, whether RCBOs or a split load arrangement is used, and whether surge protection is included. Then the practical details. How accessible the board is. Whether the tails and earthing need upgrading. Whether the meter sits in an outside box or a cramped understairs cupboard with the hoover in front of it. Whether the existing circuits pass their tests or need remedial work first. A quote that lists those items separately is far easier to compare than one line reading "supply and fit new board".

Should I have an EICR first?

On an older installation it is often the sensible order. An Electrical Installation Condition Report tells you the state of the circuits before you spend money at the board, so you are not discovering problems halfway through the changeover. If the report shows the wiring is sound, the board swap is straightforward. If several circuits are near the end of their life, you can weigh up whether partial rewiring makes better sense than a new board bolted onto tired cable.

Booking the work in

Williams Electrical Kent covers Canterbury along with Sittingbourne, Maidstone, Ashford, Dartford and the areas we cover across the county, carrying out electrical services for homes across Kent to BS 7671 as a NAPIT registered team.

If your board is looking its age, or something keeps tripping and nobody has got to the bottom of it, call 07825 333341 or send over a photo of your existing board and we can talk you through what is likely involved. There are more answers on our frequently asked questions page.

Common questions

Is replacing a fuse board notifiable work in Canterbury?

Yes. Consumer unit replacement is notifiable under Part P of the Building Regulations in England. A registered electrician can self certify the work, so you receive a Building Regulations compliance notification alongside the Electrical Installation Certificate without having to involve building control separately.

Why do my circuits keep tripping after a new consumer unit?

Modern RCBOs and RCDs are far more sensitive than old rewireable fuses, so small earth leakage faults that went unnoticed for years can show up straight away. Damp cable running out to a garage, a faulty appliance, or a borrowed neutral between light circuits are common causes, and they should be traced and fixed rather than worked around.

Should I get an EICR before upgrading my fuse board?

On an older property it is usually worth it. An Electrical Installation Condition Report shows the condition of the existing circuits, earthing and bonding before the board is changed, so you know whether remedial work is needed and whether a new board on its own is the right spend.

Want a straight answer about your own job?